Upgrade Two Humidification Package Units

Upgrade Two Humidification Package Units

ARCHITECT

LDA Architects
AIES Engineering

PROJECT SIZE

100,000.00 SF

LOCATION

750 Folsom St, San Francisco CA 94103, CA

COMPLETION DATE

June 2025

PROJECT SCOPE

Scope included design and build to retrofitting two existing Dectron humidification units (5700 CFM each) serving the ice rink arenas. Mechanical work covered removal and replacement of internal components, duct modifications, insulation, and full system commissioning to improve performance and efficiency.
The project also involved architectural and MEP work, including suspended ceiling tile replacement, fire sprinkler adjustments, painting, and replacement of light fixtures in impacted areas.
CONVERGENT CONSTRUCTION

Upgrade Two Humidification Package Units

ARCHITECT

LDA Architects
AIES Engineering

PROJECT SIZE

100,000.00 SF

LOCATION

750 Folsom St, San Francisco CA 94103, CA

COMPLETION DATE

June 2025

PROJECT SCOPE

Scope included design and build to retrofitting two existing Dectron humidification units (5700 CFM each) serving the ice rink arenas. Mechanical work covered removal and replacement of internal components, duct modifications, insulation, and full system commissioning to improve performance and efficiency.
The project also involved architectural and MEP work, including suspended ceiling tile replacement, fire sprinkler adjustments, painting, and replacement of light fixtures in impacted areas.
CONVERGENT CONSTRUCTION
Scroll to Top