Gavilan College – Path of Travel Alterations.

Gavilan College–Path of Travel Alterations

ARCHITECT

Steinberg Hart Civil Engineering BKF Engineers

PROJECT SIZE

5000 SF

LOCATION

5055 SANTA TERESA BLVD. GILROY, CA 95020

COMPLETION DATE

Nov. 2025

PROJECT SCOPE

This design-build project includes the demolition and replacement of existing concrete walkways and accessible parking stalls located between the campus bus stop and the upcoming Library Student Resource Center.
The work ensures full compliance with current California Building Code (CBC) accessibility standards, specifically under CBC 11B-202.4 Exception 4 and 5, focused on barrier removal.
The project is a key component of the campus modernization effort and supports access to future facilities.
CONVERGENT CONSTRUCTION

Gavilan College–Path of Travel Alterations

ARCHITECT

Steinberg Hart Civil Engineering BKF Engineers

PROJECT SIZE

5000 SF

LOCATION

5055 SANTA TERESA BLVD. GILROY, CA 95020

COMPLETION DATE

Nov. 2025

PROJECT SCOPE

This design-build project includes the demolition and replacement of existing concrete walkways and accessible parking stalls located between the campus bus stop and the upcoming Library Student Resource Center.
The work ensures full compliance with current California Building Code (CBC) accessibility standards, specifically under CBC 11B-202.4 Exception 4 and 5, focused on barrier removal.
The project is a key component of the campus modernization effort and supports access to future facilities.